Uttarakhand Tunnel Collapse Reside Updates: Vertical Drilling Reaches 19.2 Metres, Say Rescue Officers

UTTARKASHI: In a major improvement within the ongoing rescue operation at Uttarkashi’s tunnel, officers from the Nationwide Highways and Infrastructure Growth Company Restricted (NHIDCL) on Monday stated that vertical drilling has reached a depth of 19.2 meters on the 18th day of the continued rescue operations. The Silkyara tunnel collapse on November 12 left 41 staff trapped, prompting pressing efforts to free them.

Quick-Paced Rescue Operation

Addressing a press convention, NHIDCL Managing Director Mahmood Ahmad revealed that the drilling, a vital a part of the rescue technique, is progressing quickly. “We’ve accomplished round 19.2 meters of drilling. We’ve to drill round 86 meters inside 4 days by November 30,” stated Ahmad. He expressed optimism that the work could be accomplished on time, barring any unexpected obstacles.

 

 

Auger Machine Elimination Accelerates

Neeraj Khairwal, the Secretary of the Uttarakhand Authorities and the nodal officer within the rescue operation, highlighted the accelerated tempo of labor to take away the caught auger machine from the tunnel. With the introduction of superior equipment, the operation is advancing easily, with no reported hurdles. Khairwal emphasised a optimistic trajectory within the rescue efforts.

Panel Fashioned to Discover Escape Passage

Amidst the continued drilling, NHIDCL MD Mahmood Ahmad acknowledged the consideration of an escape passage. He revealed the formation of a committee to discover this feature, emphasizing that the fast precedence is the secure extraction of the trapped staff. 

Pipeline Drilling In Progress

Officers reported the completion of an 8-inch pipeline drilling for 70-80 meters, quickly halted, whereas a 1.2-meter diameter pipeline drilling reached 20 meters.

Devotees Gentle Lamps For Trapped Employees

Forward of ‘Dev Deepawali,’ devotees gathered at Har Ki Pauri in Haridwar to gentle 21,000 lamps, providing prayers for the trapped staff within the Silkyara Tunnel.

 

 

All Employees Protected And Secure

Lt Common (Rtd) Syed Ata Hasnain from the Nationwide Catastrophe Administration Authority (NDMA) offered updates on the drilling progress. Plan 2, involving vertical drilling, is underway, with 17 meters already accomplished. Plan 3, sideways drilling, is but to be applied. Lt Common Hasnain assured that every one staff are in secure and secure circumstances. Medical and psycho-social assist is being offered, and drone cameras monitor the rescue operation.

Union Minister VK Singh Visits Web site

Union Minister Common VK Singh visited the Silkyara tunnel website to supervise the continued rescue operation, the place a unit of Madras Sappers has been deployed for handbook drilling.

Handbook Drilling, Rat Boring Being Thought-about

To expedite the rescue, the Indian Military, together with civilians, is contemplating handbook drilling strategies, together with rat boring. This includes utilizing palms, hammers, and chisels to clear particles contained in the tunnel.

Provides And Communication Inside Tunnel

Freshly cooked meals, fruits, medicines, and communication instruments are being offered to the trapped staff by means of a lifeline, guaranteeing their well-being throughout the operation. THDC has initiated the development of a rescue tunnel from the Barkot finish, aiming to create an alternate route for the rescue operation. The Border Roads Group (BRO) and different businesses are actively concerned in infrastructure improvement to assist the rescue efforts.

The tunnel collapse occurred on November 12, trapping 41 staff inside. Since then, numerous businesses, together with THDC, BRO, and ONGC, have collaborated to expedite the rescue operation. The scenario is being intently monitored, and the collaborative efforts intention to make sure the secure and swift extraction of the trapped staff.




Supply by [author_name]